Beacon by Monolith

Beacon by Monolith

Test on site. Catch up later. Leave with the paperwork done.

Emergency lighting testing for people who still have to find the plant room key. Works without signal, keeps the site logbook alive, and turns the visit into paperwork you can hand over — not rewrite in the van.

Free in open beta · No card · A few minutes to add your first site

Open beta Free No card Made in the UK For BS 5266 work

For contractors, competent persons, and the folks juggling more than one site.

Compliance shouldn’t live in WhatsApp and a spreadsheet called Final_v7.

Too many teams still rebuild the visit after they’ve left site. Photos on three phones. A spreadsheet that doesn’t match the wall. That failed lamp disappears into last month’s PDF and never comes back.

  • Paper logbooks and Excel that don’t match what’s on the wall
  • Notes and photos scattered — no one place for the site
  • Rewriting the visit in Word when you should already be home

Field for the visit. Console for the office.

Same company, same sites, same story. Technicians work in Field on the phone — even underground. Managers see sites, history, team, and certificates on the desktop.

Riverside Court

Status

Monthly · Jul 2026 · Next Aug 2026
Annual · Due from Aug 2026
Open defects (3) Needs attention before sign-off

Monthly test

Field On-site testing, defects, and history — even with no signal.

Beacon Console

Sites

Acme Facilities
3Sites
1 Need attention
1 In progress
1Up to date
Search sites… Add site
SiteFittingsMonthlyAnnual
Riverside Court 42 Jul 2026 · Next Aug Due from Aug 2026
Harbour House 28 Not done yet Jun 2026 · Next Jun
Westgate Retail 61 Jul 2026 · Next Aug May 2026 · Next May
Console Every site at a glance — certificates, team, and what’s going on.

Three steps. No heroic evening of admin.

  1. 1

    Add the site

    Start fresh or bring your fittings across from a spreadsheet. Set the test switches and site IDs once.

  2. 2

    Do the visit

    Monthly function or a timed annual by test switch — in Field, results as you walk the building.

  3. 3

    Hand over the paperwork

    Issue the visit report or site certificate from what you just did — then catch up when you’re back online.

  • Free in open beta
  • No card
  • Your data stays yours
  • We’ll warn before pricing
  • Not a BSI product certification

A short visit, from fail to the site register.

A simplified walkthrough of the real Field flow — same screens you’d use on site, no account needed.

Beacon
Riverside Court
Ashton Mill

Northside Estates

Monthly · Jul 2026 · Next Aug Annual · May 2026 · Next May
36 fittings0 unassigned
Harbour House

Quay Holdings

Monthly · Not done yet Annual · Jun 2026 · Next Jun
28 fittings2 unassigned
Quay Point
Monthly · Jul 2026 · Next Aug Annual · Apr 2026 · Next Apr
22 fittings0 unassigned
Riverside Court

Riverside Group

14 Quay Lane

Monthly · In progress — Jul 2026 Annual · Due from Aug 2026
48 fittings1 unassigned
Station Road
Monthly · Jul 2026 · Next Aug Annual · Due from Jul 2026
19 fittings0 unassigned
Westgate Hub
Monthly · Jul 2026 · Next Aug Annual · May 2026 · Next May
61 fittings0 unassigned
Bridgewater Place
Monthly · Jul 2026 · Next Aug Annual · Due from Aug 2026
44 fittings0 unassigned
Kingsway Depot
Monthly · Jun 2026 · Next Jul Annual · Feb 2026 · Next Feb
15 fittings0 unassigned

Status

Monthly · In progress — Jul 2026
Annual · Due from Aug 2026

Open defects (1)

  • EL-031 — Indicator fault · Interim

Site snapshot

48 Fittings 6 Switches 1 Open defect

July monthly test

0/3 tested 0%
Basement 0/3 tested

EL-012

Stair A

EL-024

Corridor B

EL-018

Plant room

Built for how emergency lighting is actually tested.

Offline visits, paperwork from the test, a register that carries forward — not a generic cert form with “emergency lighting” stuck on the side.

Works underground. Literally.

Plant rooms and basements don’t care about your signal bars. Keep testing anyway — results stay on the phone and catch up when you’re back upstairs.

  • Add to your home screen from the browser — no App Store dance
  • Push your work up when you’ve got coverage
  • Same sites ready in Console for the office
Waiting to catch up 3 visits ready

12 fittings updated · will send when you’re online

Monthly function as you walk the building

Pass or fail each fitting as you go — with notes and photos where you need them. The visit stays on the site, not scattered across phones and scraps of paper.

  • Results on every fitting you touch
  • Notes and photos when something’s wrong
  • See how far through the visit you are
EL-012 Stair APass
EL-018 Plant roomFail
EL-024 Corridor BPass

Annual duration with a real clock

Run the discharge for the time the site was designed for, switch by switch — with a timer on each one. Not a hopeful tick from the car park.

  • One-hour or three-hour runs from how the site is set up
  • A timer per test switch so nothing gets skipped
  • Results saved as you go through the building
Annual · Switch TS-02

Needs 3 hours · Running now · 4 of 6 switches done

Paperwork you can hand over before you leave

Fitting results, a visit inspection report, or a site certificate — each with its own reference. Once it’s issued and locked, it stays that way. History keeps the trail.

  • Test report with the fittings you covered
  • Visit inspection report — see sample
  • Site periodic certificate — see sample
Test reportWhat passed and what didn’t
Visit reportRef PIR-…
Site certificateRef BCN-…

Failed fittings don’t get to ghost the next visit

When something fails, it stays open on the site until it’s fixed or closed properly. Photos travel with it. Paperwork you’ve already issued doesn’t get rewritten to hide the mess.

  • Open defects right there on the site overview
  • Photos on the findings that need proving
  • Issued documents stay as they were signed
Open defects (3)

EL-018 Plant room — lamp failed to strike

EL-031 Car park — battery didn’t last

Sort these before you sign off

Bring the spreadsheet. Keep the register alive.

Point your old logbook columns at rooms, site IDs, switches, and floors. Next month you’re not retyping the building — the register comes with you.

  • Import from the spreadsheet you already have
  • Site IDs, locations, switches, floors — kept tidy
  • History and defects stay tied to the same fittings
Your Site IDBeacon
LocationRoom / area
SwitchTest switch
42 rows readyImport

Set the site up once — properly

Responsible person, how long the batteries should last, whether there’s an automatic test system, which switches run the annual. Timers and paperwork then match the building, not a blank form.

  • Client and responsible person details
  • Design duration and automatic test system
  • Test switches that drive the annual run
Site setup

Duration 3 hours

Auto test Not fitted

Switches TS-01 · TS-02 · TS-03

Responsible Building Manager

The office view that doesn’t need a chase-up call

See every site in one place, invite your technicians, check who changed what, and put your company details on the PDFs so the pack looks like it came from you — because it did.

  • Sites, history, and paperwork in one desk view
  • Invite the team and keep roles clear
  • Your branding on the paperwork you issue
Sites3 · 1 needs a look
TeamOwner · Technicians
HistoryWho changed what

Real documents. Not a pretty mock that falls apart later.

These are the layouts Beacon issues from a visit — proper titles, references, lettered sections, and sign-off. Once you lock a document, it stays as it was signed. No quiet rewrites after you’ve left site.

Emergency Lighting Periodic Inspection Report The visit report you can issue when the test is done — sample preview.
Emergency Lighting Periodic Inspection and Testing Certificate The site certificate for continued compliance — sample preview.

Want to issue one of these from a real visit?

No card · Free in open beta · Managers welcome

Spreadsheets and generic cert apps weren’t built for this job.

The old way

  • Retype fittings into Word or Excel after every visit
  • Hope the annual “three hours” actually happened
  • Defects buried in last month’s PDF
  • No one living list of what’s on the wall

With Beacon

  • Issue the report or certificate from the visit you just did
  • Timed annual discharge, switch by switch
  • Open defects stay on the site until they’re closed
  • Site IDs, fittings, and switches come with you next month
  • Issue a visit report from the test — no rewrite in the van
  • Keep testing when the signal disappears
  • Bring fittings across from the logbook spreadsheet you already have

Built for people who actually walk the building.

Open beta Free while we test Made in the UK For BS 5266 work Contractors Competent persons Multi-site managers

Beacon helps you record the tests and issue the paperwork that goes with proper BS 5266 practice. The duty-holder still owns fire-safety compliance — we’re not pretending otherwise, and this isn’t a BSI product certification.

It’s free in open beta. We’ll tell you about pricing before anything is charged. No quiet lock-in. Your feedback genuinely shapes what we build next — we’re still listening, not coasting.

The questions we’d ask before trying it too.

Does it work when there’s no signal?

Yes. Field is built for plant rooms and basements. Keep testing with no bars; when you’re back online, your work catches up. Console is for the office when you’ve got a connection.

Is this enough for BS 5266?

Beacon is built around how emergency lighting is actually tested: monthly and annual runs, a proper site register, open defects, visit reports, and periodic certificates. It helps you record the work and issue the paperwork — the duty-holder stays responsible for compliance. It isn’t a BSI product certification.

What’s Field vs Console?

Field is the phone or tablet app you take on site — testing, defects, and history, even offline. Console is the desktop side for sites, team, history, and certificates across the company. Same world, two jobs.

Can I bring in an existing logbook?

Yes. Add a site, import your fittings from a spreadsheet, then set test switches and site IDs before the first visit. No need to retype the building from scratch.

Do I need an App Store download?

No. Open Field in the browser on your phone or tablet and add it to your home screen. Console is just a normal desktop browser. No card needed to start the open beta.

What paperwork can I issue today?

After a visit: a fitting test report and a visit periodic inspection report. For the site: a periodic inspection and testing certificate. Once something is issued and locked, it stays as signed.

How much does it cost?

Free in open beta. We’ll tell you about pricing before anything is charged — no quiet lock-in.

Where is my data kept?

Your organisation’s data lives securely in Beacon’s cloud. On site, Field can keep the visit on the phone until you’re back online. Details are on the privacy page.

Come and try it while it’s free

Make an account, add a site, and run a real monthly or annual visit. We’re in open beta — free for now, and we’ll tell you before anything costs money.

No card · A few minutes to add your first site